Project Details

Project Name Upper Westside Specific Plan
Description The project proposes a new Specific Plan on approximately 2,083 acres in the unincorporated Natomas community. Necessary entitlements include multiple General Plan Amendments, including moving the UPA and USB.
Address 2651 EL CENTRO RD, SACRAMENTO, CA 95833-9703 Community Natomas
Application No. PLNP2018-00284 Project Status Pending
Property Owner Project Applicant Nick Avdis
Parcel No. 225-0210-005 Entitlement
Filing Date 10/1/2018 Final Hearing Date
Project Manager Email    

Hearing Information (5)

Hearing items found: 5

Hearing Body: Board of Supervisors 
Location: 700 H Street,
Board Chambers,
 
Date: 1/24/2023 
Time: 10:00:00 AM 
Continued:  
Final Action:  
Testimony:  
Entitlement:  
Disposition: Approved 
Appeal: No 


Action Description: The Board of Supervisors voted (5 Yes - 0 No) to approve all of these entitlements.
Hearing Body: Board of Supervisors 
Location: 700 H Street,
Board Chambers,
 
Date: 9/22/2020 
Time: 3:15:00 PM 
Continued:  
Final Action:  
Testimony:  
Entitlement:  
Disposition: Approved 
Appeal: No 


Action Description: The Board of Supervisors voted (5 Yes - 0 No) to approve all of these entitlements.
Hearing Body: Planning Commission 
Location: Teleconference-Video,
 
Date: 7/27/2020 
Time:  
Continued:  
Final Action:  
Testimony:  
Entitlement:  
Disposition: Approval Recommended 
Appeal: No 


Action Description: The Planning Commission unanimously (5-0) recommended that the Board initiate environmental review and adopt the reimbursement agreement.
Hearing Body: Natomas CPAC 
Location: Teleconference-Video,
 
Date: 6/11/2020 
Time: 6:00:00 PM 
Continued:  
Final Action:  
Testimony:  
Entitlement:  
Disposition:  
Appeal: No 


Action Description: The CPAC members voted affirmatively (5-0-0) to recommend initiation of the environmental review process and adoption of the reimbursement agreement to the Board of Supervisors. Two CPAC members had technical difficulties at this point in the meeting, so their votes could not be recorded.
Hearing Body: Board of Supervisors 
Location: 700 H Street,
Board Chambers,
 
Date: 2/26/2019 
Time: 2:15:00 PM 
Continued:  
Final Action:  
Testimony: Yes 
Entitlement:  
Disposition:  
Appeal: No 


Action Description: Approved Resolution No. 2019-0129 initiating the Upper Westside Specific Plan, subject to the Master Plan Procedures and Preparation Guide and County Code 21.14.060; approved the proposed Outreach Program as amended; determined the scope of the Study Area for potential plan boundaries is appropriate; directed the Planning Director to assemble and convene a Technical Advisory Committee consistent with the Board-adopted Master Plan Procedures and Preparation Guide and County Code Section 21.14.060 (F); and authorized the Planning Director to sign the Funding Agreement between the County of Sacramento and the Owners’ Group.

Documents (34)

Published documents found: 34

Group CategoryDocument TitlePublished Date
Worksheet – Project DescriptionWorksheet - Project DescriptionPLNP2018-00284 Natomas CPAC Chair Packet 6-11-20206/9/2020 6:34:50 PM
Worksheet – Project DescriptionWorksheet - Project DescriptionPLNP2018-00284 Natomas CPAC Chair Packet 6-11-20206/4/2020 5:44:05 PM
Project DocumentsEnvironmental Impact Report - DraftNOP_Table NOP-1: Preliminary Land Use Plan Summary10/6/2020 10:15:24 PM
Project DocumentsEnvironmental Impact Report - DraftNOP_Plate NOP-8: Preliminary Land Use Plan Exhibit10/6/2020 10:15:22 PM
Project DocumentsEnvironmental Impact Report - DraftNOP_Plate NOP-7: Rezone Exhibit10/6/2020 10:15:20 PM
Project DocumentsEnvironmental Impact Report - DraftNOP_Plate NOP-6: Bicycle Master Plan Exhibit10/6/2020 10:15:18 PM
Project DocumentsEnvironmental Impact Report - DraftNOP_Plate NOP-5: Proposed Transportation Plan Exhibit10/6/2020 10:15:17 PM
Project DocumentsEnvironmental Impact Report - DraftNOP_Plate NOP-4: Proposed Land Use Diagram Exhibit10/6/2020 10:15:15 PM
Project DocumentsEnvironmental Impact Report - DraftNOP_Upper Westside Specific Plan10/5/2020 4:41:51 PM
Project DocumentsCorrespondence - General PublicPLNP2018-00284 Public Comment CPAC 6-11-20 SET 16/12/2020 8:03:02 PM
Project DocumentsCorrespondence - General PublicPublic Comments - Natomas CPAC 6-11-206/12/2020 12:41:29 AM
Project DocumentsCorrespondence - General PublicPublic Comments - CPAC 6-11-206/12/2020 12:04:04 AM
Project DocumentsCertification/Declaration of MailingPLNP2018-00284 Natomas CPAC Signed COM 6-11-20206/11/2020 7:30:44 PM
Project DocumentsApplication FormDraft Reimbursement Agreement6/3/2020 5:16:44 PM
Project DocumentsApplication FormResource Avoidance and Mitigation Strategy5/7/2020 11:02:20 PM
Project DocumentsApplication FormWater Infrastructure Feasibility Review5/7/2020 11:02:19 PM
Project DocumentsApplication FormSewer Infrastructure Feasibility Review5/7/2020 11:02:16 PM
Project DocumentsApplication FormDrainage Infrastructure Conceptual Feasibility Review5/7/2020 11:02:13 PM
Project DocumentsApplication FormTraffic Conceptual Feasibility Analysis5/7/2020 11:02:09 PM
Project DocumentsApplication FormApplication Attachment5/7/2020 11:02:05 PM
Project DocumentsApplication FormProject Description5/7/2020 11:01:58 PM
Project DocumentsApplication FormProperty Ownership Exhibit5/7/2020 11:01:56 PM
Project DocumentsApplication FormPreliminary Land Use Plan Exhibit5/7/2020 11:01:52 PM
Project DocumentsApplication FormRezone Exhibit5/7/2020 11:01:49 PM
Project DocumentsApplication FormGP Amendment Bicycle Master Plan Exhibit5/7/2020 11:01:48 PM
Project DocumentsApplication FormGP Amendment Transportation Plan Exhibit5/7/2020 11:01:46 PM
Project DocumentsApplication FormGP Amendment Land Use Diagram Exhibit5/7/2020 11:01:44 PM
Project DocumentsApplication FormAuthorization Letter 25/7/2020 11:01:41 PM
Project DocumentsApplication FormAuthorization Letter 15/7/2020 11:01:39 PM
Project DocumentsApplication FormApplication5/7/2020 11:01:36 PM
Project Documents500 Foot Radius Map500 Foot Radius Map11/27/2018 5:51:12 PM
Project DocumentsProject Exhibits - Site PlanProposed Land Use Plan 9-25-1811/27/2018 5:51:08 PM
Project DocumentsCorrespondence - Applicant TeamApplication Attachment and Project Description 9-25-1811/27/2018 5:51:04 PM
Project DocumentsCorrespondence - Applicant TeamUpper Westside Cover Letter11/27/2018 5:51:03 PM